Skip to content

About the project

Milestones of the RESHeat project

Milestones

MilestoneCorresponding WPDue date
Initial design documentation for demonstration installationsWP111.2021
Optimized design of RESHeat systems for demonstration facilities in Poland and Italy.WP208.2022
Out-of-the-box RESHeat design softwareWP311.2022
Completed construction of demonstration installations in Poland (Krakow and Limanowa) and Italy (Palombara Sabrina)WP411.2023
Taking into account the conclusions of the ecological analysis and LCAWP511.2024
At least two contracts signed on RESHeat replicationWP611.2024